Container Offices
2 container office units plus 4 container storage / living quarter units for site teams.
4,500 m² of office, workshop and material storage in Kapuk Utara, North Jakarta — where every duct we install is fabricated under our own quality control.
Many HVAC contractors outsource their ducting. We don't. Our workshop runs automated production lines for square and spiral duct, with dedicated raw material storage across three workshop halls (north, south and east areas). That means consistent quality, controlled cost, and lead times we can actually promise.
Automated machines for forming, flanging, locking, bending and spiral duct production.
| Type of Machine | Units |
|---|---|
| Auto Line Duct Forming Machine — type AML III | 1 |
| Transverse Flange Machine — type T 30 | 1 |
| Transverse Flange Machine — type T 12 | 1 |
| Pittsburgh Lock Machine — type LC 12DR | 2 |
| Three Roller Bending Machine — type W11G | 1 |
| Hand Folder Duct Forming Machine — type WS 15 | 1 |
| Power Swaging Machine — type LX 15 | 1 |
| Welding Machines | 2 |
| Spiral Duct Machine | 1 |
| Spot Welding Machine | 1 |
| Scissor Lift — 16 m height | 2 |
Our project sites are self-sufficient — we mobilize our own facilities and tools so work starts fast and keeps moving.
2 container office units plus 4 container storage / living quarter units for site teams.
Lifts reaching 16 m and 18 m working height for high-ceiling installation work.
2 × 20 kVA generators so fabrication and installation never wait for site power.
Complete measurement tools for HVAC testing, commissioning and balancing.
Major industrial clients audit safety before they award contracts — and we pass those audits. Our dedicated HSE officer runs a structured program on every project:
We welcome clients and consultants to inspect our facility and production quality in Kapuk Utara, North Jakarta.
Arrange a Visit